2025 Overall Facility of the YearGuardian Storage
Morgantown, WV
Janus doors and hallways, Nokē smart locks and smart keypads
Self-storage new construction
Janus provides the products, services and expertise for new self-storage development, from estimating, drafting and design through manufacturing, project management and installation. Ground-up builds, conversions and expansions, with one team accountable from the first layout to opening day.
Talk to our new construction team: (866) 562-2580
What we deliver
Doors and hallway systems, buildings, Nokē smart entry, security gates and faux windows, backed by the design, project management and installation teams that bring them together on site.

The 650 Series is the most installed roll-up door in self-storage, joined by 750 and 850 wind-load doors, the NS Series, swing doors, lockers and complete interior hallway systems.
Doors and hallways →
Single-story, multi-story and climate-controlled steel buildings, with design, engineering, manufacturing and construction planned around your unit mix.
Plan your building →
Hardwired, inside-the-door smart locks built into your doors from day one, plus smart keypads, keyless entry, a branded tenant app and a cloud portal.
Nokē Smart Entry →
V-track, vertical pivot lift, swing, cantilever slide and pedestrian gates, manufactured by Janus and kept in stock so your first line of defense ships on schedule.
Security gates →
Deliver the visual impact of traditional windows without the added cost, maintenance, or security considerations of functional glass.
Faux windows →
Turn an existing building into self-storage, add buildings or stories to a site you own, or build up, not out, with full and partial mezzanines.
Conversions and expansions →
Layouts, system heights and unit configurations designed to maximize net rentable square feet, value engineered for materials, constructability and long-term performance.
How we work →
Dedicated project managers plan loading, logistics and deliveries, and coordinate with your GC and trades while Janus crews install.
How we work →
Every type of project
Janus works with developers early, when decisions about building design, unit mix, materials and constructability have the biggest effect on cost and rentable space.
Single-story drive-up, multi-story climate-controlled and mixed sites, from a single facility to a multi-market development program across North America.
Products and expertise for turning existing buildings into self-storage, like Fletcher Storage in Redding, CT, the 2025 Conversion Facility of the Year.
Add buildings to a site you already operate, or build up, not out, with full-floor mezzanines rated for 125-PSF floor loads and partial mezzanines.

Nokē Smart Entry by Janus International
INSIDE-THE-DOOR. HARDWIRED. SLEEK. POWERFUL.
Nokē gives operators the ability to turn smart security into a premium amenity and an opportunity to generate incremental revenue. Specify it during construction and your facility opens with smart security on every unit.
“I would never build a new facility without Nokē Smart Entry.”Travis Morrow, CEO, StoreLocal
Why Janus
Janus focuses on the total value of your project, not the lowest-cost door. Cutting material cost shows up later in installation time, durability, service and long-term operating cost.
The Model 650 has led the industry for more than two decades and remains the most installed roll-up door in self-storage. Janus doors are built for 30,000 cycles and made in Georgia, Texas and Arizona.
Our design department lays out system heights and unit configurations to maximize net rentable square feet, and plans how your interior system works with sprinkler requirements.
We review your building design, unit mix, materials and constructability early, so the savings come from smarter decisions rather than thinner steel.
A project management department that stays in the field visits each site, works out loading and logistics, and schedules deliveries around your GC and other trades.
A three-year limited warranty on self-storage roll-up doors and building components, and a 40-year limited paint warranty (35-year no-fade) on applicable door models.
Janus doors can be installed in as little as three minutes, hallway systems are designed for straightforward installation, and Nokē smart locks can ship factory-installed on Janus doors.
How we work
“Our view is simple: our products need to work for our customers in the most demanding environments and perform in the field for years to come.”Ramey Jackson, CEO, Janus International
2025 MSM Facility of the Year
Award-winning facilities start with award-winning products. Janus and Nokē products are inside five of Modern Storage Media’s 2025 Facility of the Year winners.
2025 Overall Facility of the YearMorgantown, WV
Janus doors and hallways, Nokē smart locks and smart keypads
2025 New Facility of the YearSurprise, AZ
Janus interior systems and security systems
2025 Construction Facility of the YearEnglewood, NJ
Janus doors and hallways, Nokē smart locks and smart keypads
2025 Smart Facility of the YearNashville, TN
Janus doors and hallways, Nokē smart locks and smart keypads
2025 Conversion Facility of the YearRedding, CT
Janus doors and hallways, Nokē smart locks and smart keypads
Customer testimonials
“If we had to change the size of a building or change the number of stories… midway through the construction process, Janus was able to modify the door and hallway systems… all in one place.”
“With a tech background, I was really focused on people opening one single app to access everything that they need. Janus delivers that product, and they deliver it very, very well.”
“Janus has been a great partner of ours for as long as we’ve been building self-storage. We love their product.”
“Keeping everything under one roof… with Janus doing the install, all the lockers, the mezzanine… made our job a lot easier… Everything just fit right together.”
Guardian Storage in Morgantown, WV, had 31 move-ins on opening day and 126 in its first two weeks, with Janus doors and hallways and Nokē Smart Entry.
CubeSmart East Nashville opened with Nokē locks factory-installed on every Janus door and is leasing up faster than projected.
Public Storage at Chandler Air Park, AZ, about 1,000 climate-controlled units built under FAA constraints with Janus doors and hallways.
Customer SpotlightCubeSmart East NashvilleNokē factory-installed on every Janus door, leasing up faster than projected.Watch the video
Video Case StudyPublic Storage, Chandler Air ParkTwo stories below ground, built under FAA constraints with Janus doors and hallways.Watch the video
Video Case StudyTrojan StorageNo break-ins in two years across 13 Trojan facilities with Nokē Smart Entry.Watch the video
Overview VideoMore Than DoorsSee how Janus delivers complete self-storage projects, from buildings to smart locks.Watch the videoCommon questions
Janus provides roll-up and swing doors, lockers, interior hallway and partition systems, mezzanines, single-story and multi-story steel buildings, security gates, faux windows and Nokē smart entry, along with estimating, drafting and design, value engineering, project management and installation.
Yes. Janus supplies products and expertise for converting existing buildings into self-storage, adding buildings to an operating site and building up with full or partial mezzanines. Fletcher Storage in Redding, CT, the 2025 MSM Conversion Facility of the Year, was built with Janus doors, hallways and Nokē.
Yes. Nokē Ion is a hardwired, inside-the-door smart lock optimized for Janus self-storage doors, so it can be specified with your doors and installed during construction. Facilities like CubeSmart East Nashville opened with Nokē on every unit.
Janus self-storage steel roll-up doors and building components carry a three-year limited warranty, and applicable door models carry a 40-year limited paint warranty with 35 years of no-fade protection. Janus doors are built for 30,000 cycles.
Send us your site plan or concept and our team will help with layout, value engineering and a quote.